Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | Yes |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
No. | Model | OD(mm) | Plate width(mm) | Thickness(mm) | Coil weight(ton) | Power(kw) | Floor area(m) |
1 | LH-400 | Φ219-Φ426 | 400-750 | 5-10 | 10 | 180 | 18x180 |
2 | LH-500 | Φ219-Φ529 | 400-800 | 5-11 | 15 | 200 | 18x180 |
3 | LH-600 | Φ219-Φ630 | 450-1050 | 6-12.7 | 20 | 240 | 21x180 |
4 | LH-700 | Φ219-Φ720 | 500-1250 | 5-14 | 20 | 260 | 21x180 |
5 | LH-800 | Φ219-Φ820 | 500-1300 | 6-18 | 30 | 380 | 24x180 |
6 | LH-1000 | Φ219-Φ1020 | 500-1300 | 6-20 | 30 | 390 | 24x180 |
7 | LH-1400 | Φ325-Φ1420 | 500-1560 | 6-22 | 30 | 400 | 26x180 |
8 | LH-1600 | Φ426-Φ1620 | 500-1560 | 6-25.4 | 40 | 510 | 30x180 |
9 | LH-1800 | Φ508-Φ1820 | 1100-1600 | 8-25.4 | 40 | 510 | 30x180 |
10 | LH-2400 | 508-Φ2540 | 1200-2000 | 8-25.4 | 40 | 530 | 30x180 |
11 | LH-3000 | Φ508-Φ3048 | 1200-2000 | 8-25.4 | 40 | 530 | 30x180 |
Test sequence of helical welded pipe unit LH-400
1, motor and hydraulic motor idling test, check whether the spin direction is correct.
2. The single test run time is 2 hours.
3, reducer gear transmission smooth, sound normal, good lubrication, no oil leakage phenomenon.
4. The leveling roller and delivery roller rotate normally, and there shall be no channeling phenomenon.
5. The oil cylinder and pipe joint of the hydraulic system shall not leak oil during the test run.
6. Process operation and instructions:
6.1 Process description of spiral welded pipe Unit LH-400:
Winding up → unwinding → primer leveling → Manual vertical roller → shear butt welding → manual vertical roller → Delivery → Prebending guide plate → Forming → external welding → Output → cutting → pulling out
6.2 Operation Instructions:
The strip coil is hoisted on the lifting frame of the winding trolley by the crane, and the hook is removed. The trolley moves horizontally and sends the strip coil to the cone head of the uncoiler. The oil cylinder of the cone head of the uncoiler tightened the steel coil. The trolley lift is lowered back to its original position. After tightening the strip coil. Press the roller on the upper part of the strip steel coil, do not make the steel coil loose. The cone head and the press roller rotate simultaneously (point). Turn the head of the strip coil to the unwinding position. The spatula of the priming device extends. Cone head and press roll rotation, the strip coil tongue smoothly into the clip feed primer leveling machine. (The pressure of the leveling roller is adjusted in advance according to the thickness of the plate) The clutch of the uncoiler is released, the micro-brake is adjusted, and the press roller is lifted. Shear head and tail butt welding. When the butt welding trolley is in the retracted position of the oil cylinder, the tail should be cut. When the trolley is extended 700mm, the head should be cut. The conveyor will send the butt welded strip to the molding machine through the prebending guide plate, and the formed steel pipe will be welded outside, output through the output bracket on the rear axle and the roller, cut into a fixed size, and then pulled out by the material dispensing device.
Our company profile
1. What's your warranty?
Two years, during which all parts damaged because of the quality problem will be changed for free, but not include damage caused by natural disaster or inappropriate operation or human factor.
2. What's your delivery time?
Within 60 days after receiving prepaid. Some machines are in stock, so can be delivered at any time.
3. What are your payment terms?
30% deposit is paid before production, the balance should be paid after inspection confirmation and before shipment.
4. What's your install and training?
If buyers come to our factory to inspect, the training to install and operate is provided face to face.
If not, a manual and video are provided to show how to install and operate.
5. What's your after-sale service?
We provide 24-hour online service for our customers.
(1) The seller will test the machines freely in China, and the traffic expense in
China of the technique people will be paid by the seller. When our engineer goes to the buyer's place to test the machines, the buyer should pay the expense of accommodation, and traffic for the buyer's engineer.
(2) If the buyer sends people to receive the training of the operation given by the seller, during the training period, the seller should pay the expense of accommodation, and traffic for the buyer's engineer, as well as daily salary of USD 150.
6. How to place an order?
Inquiry---Confirm the profile drawings and price----confirm the PI---Arrange the deposit or L/C---Start design and production--- Test and inspection --- Pay the balance --- Arrange shipping